421 Road project starting slow and bad

Return of Kangz

Posted 8:38 pm, 05/21/2024

Will take 8 years to finish. 421 will be a mess for years

Joseph T.

Posted 8:35 pm, 05/21/2024

seniorflint

Posted 8:26 pm, 05/21/2024

Does anyone have a map of what 421 is going to look like when it's completed?

Joseph T.

Posted 8:23 pm, 05/21/2024

One other thing is Jobs like this come with a penalty if not finished on time and it can add up to 10s of thousand of dollars.

Joseph T.

Posted 8:18 pm, 05/21/2024

antithesis (view profile)

Posted 5:24 pm, 05/21/2024



That's the game... he put in a low big to get the contract, then he pads it over time while citing complications.
We've all seen it a thousand times.

Just be grateful they're not filling the area with 4 way stop signs and roundabouts...
No that's not how road construction works Bidders were provided with a set of plans that were drawn up buy engineers and designers. The contractors bid to build the road as designed and don't have the authority to change or add anything. If anything needs to be changed or added it must go back to the engineers and designers who will come up with the new design and issue a change order and its not a quick process. If it cost them more than the bid they are SOL unless the states agrees to a change order but there is no padding after the contract is signed and awarded.

It took almost a year for the design change and approval for my driveway when 221 was built.

Joseph T.

Posted 8:03 pm, 05/21/2024

Branch Civil Inc. is the contractor Projects like this always get off to a slow start with clearing and erosion control needing to be done before anything gets started It will pick up.

Return of Kangz

Posted 5:28 pm, 05/21/2024

The 268 job was a mess. Took years longer than it was supposed to and probably cost millions over budget.

Government can't do anything right.

Foxnose

Posted 5:27 pm, 05/21/2024

Who got the contract?

Note from GoNC: a portion of this post was removed for personal attacks.

antithesis

Posted 5:24 pm, 05/21/2024

That's the game... he put in a low big to get the contract, then he pads it over time while citing complications.

We've all seen it a thousand times.

Just be grateful they're not filling the area with 4 way stop signs and roundabouts...

Return of Kangz

Posted 5:23 pm, 05/21/2024

Rumor is contractor wants to maybe not do the job after all. This will take forever to get finished.

Matt Davis | Realtor
Whether Buyer or Selling Real Estate, I Can Help ! Feel Free To Call Or Text Me At Anytime For A Free Home Analysis. 336.957.1229
Advertise your business here for $5/day
This is crazy: in December 2023, the average banner here was seen 1,139,054 times and was clicked 170 times! Click here to advertise for less than $5 /day.
Eliminate Basement & Foundation Water Problems!
Waterproofing and gutters should be a high priority for every homeowner. With Parks Waterproofing you never have to worry about basement and foundation moisture again! Click here for more information